Menu

Medical / Healthcare

Pretoria North Medical Centre

How Pretoria North Medical Centre achieved energy independence with a 93kWp solar + 200kWh battery system. Load shedding protection for critical medical operations.

Capacity

93kWp Solar + 200kWh Battery Storage

Location

Pretoria North, Gauteng

Category

Medical

Project at a Glance

Client
Pretoria North Medical Centre (Pretoria Noord Mediese Sentrum)
Industry
Healthcare / Medical
Location
Pretoria North, Gauteng
System Size
93kWp Solar + 200kWh Battery Storage
System Type
Grid-Tie with Battery Backup

Critical Care Can't Afford Downtime

Pretoria North Medical Centre operates diagnostic equipment, pharmacy cold storage, patient monitoring systems, and general building services — all of which depend on reliable electricity. Load shedding presented a direct risk to patient care and operational continuity.

Specific pain points:

  • Load shedding disrupting appointment schedules and diagnostic equipment
  • Generator costs escalating with increased outage frequency
  • Pharmacy cold chain integrity at risk during extended outages
  • Rising Eskom tariffs increasing operating costs in an already margin-pressured healthcare environment
  • Need for a phased approach to manage cash flow while delivering immediate results

Solar + Battery — Designed for Healthcare

Gentricity designed a phased system that addressed the medical centre's most critical needs first, with the ability to expand:

System specifications:

  • 93kWp solar panel array covering available roof space
  • 200kWh lithium battery storage for load shedding protection
  • Intelligent energy management system prioritising critical medical loads
  • Real-time monitoring with automated alerts
  • Seamless integration with existing electrical infrastructure

Why this configuration:

  • Solar panels generate power during clinic operating hours, directly offsetting grid consumption
  • Battery storage covers critical loads during load shedding periods (estimated 4-6 hours backup for essential systems)
  • The system was designed in phases to match the centre's budget cycle while delivering immediate benefits

Results (Estimated based on system specifications and industry benchmarks)

Metric Estimated Value
Electricity cost reduction 50-60% of previous bill
Load shedding coverage 4-6 hours for critical loads
Generator use reduction 70-80% decrease in generator runtime
Estimated annual savings R180,000 - R250,000
Payback period 4-5 years (before Section 12B benefit)
System monitoring Real-time, 24/7

Note: Figures are estimates based on system size and SA commercial solar benchmarks. Actual results may vary.

What This Project Demonstrates

For medical and healthcare facilities:

  • Solar + battery provides the energy security that healthcare demands
  • Phased implementation allows budget management without sacrificing results
  • Critical load prioritisation ensures life-safety systems are always powered
  • Monitoring and alerting provide peace of mind for facility managers

Relevant solutions:

From approval to installation, the process was smooth and professional. The phased approach let us manage costs while still seeing immediate results.

Pretoria Noord Mediese Sentrum

Is Your Medical Facility Ready for Energy Independence?

Our engineers will assess your site, electricity usage, and goals — then deliver a detailed savings report at no cost.